Chalk aquifer
|
| After a winter of heavy rainfall, the chalk aquifer which feeds the River Pang can become saturated, causing the groundwater to rise in many springs and pools. In 2014, the westernmost sources of the Pang rose beyond West Ilsley, and the usually dry upper sections of the Pang flooded roads and houses in villages along its course. |
Contents |
[edit] Introduction
An aquifer is a geological formation that holds groundwater. The term 'groundwater' refers to all water which is below the surface of the ground and within the permanently saturated zone. A groundwater body is a distinct volume of groundwater within an aquifer, which is sufficiently porous and permeable to store and yield a significant quantity of water to a borehole, well or spring.
The properties of aquifers depend on their composition. The most important properties are porosity and yield. These characteristics dictate the aquifer’s capacity to release water through pores and influence its ability to transmit water.
[edit] What is the Chalk?
There are chalk aquifers throughout the world. However, one specific chalk aquifer, known as the Chalk, is the major aquifer of southern and eastern England. It supports the Thames Basin and the London aquifer.
The Chalk stretches from the south east of Yorkshire south into Lincolnshire. It spans across central southern England from north Norfolk through the Thames Basin and along the Kent coast to the Isle of Wight and into Dorset. It is associated with the iconic scenery of the white cliffs in and around Dover.
[edit] Characteristics of the Chalk aquifer
The Chalk aquifer has an interconnected network of fractures. Yields of approximately 150 litres per second are the highest where the density of fractures is greatest and/or where the fractures are enlarged. Most of the Chalk aquifer's storage comes from the secondary porosity of these fractures.
Made of microporous white limestone with layers of flint, the Chalk is a type of calcareous clay. Its composition also includes shells and plankton.
Its unusual structure has well developed fissures that are between 0.5 to 2% of their total volume, giving them a higher permeability. It also has low matrix permeability, which prevents water from draining quickly.
[edit] Vulnerability
Problems may occur in places where porewater found in the Chalk aquifer contains saline (such as in the Thames Basin and across East Anglia). In some regions, this can result in contamination of groundwater, particularly in areas where excessive aquifer pumping takes place.
The Chalk aquifer is susceptible to pollution from nitrates and other pesticides associated with agricultural activity. It can also become contaminated by industrial chemical leakage.
However, due to the long “lag-time” (it can take up to 40 years before undesirable pollutants leach into the soil and enter the water supply), the Chalk has been subject to specialised engineering models that simulate how these toxic materials work their way into the groundwater. Modelling has influenced decisions to increase investment in in-situ aquifer treatment.
[edit] The London Basin Chalk Aquifer management plan
In August 2018, the Environment Agency published the latest status report on the management of the London Basin Chalk Aquifer. The reports, which began in the 1990s, document the rise in groundwater levels and outline a management plan to protect the aquifer as a sustainable, secure and high-quality water resource while protecting infrastructure from floods.
The 2018 report found that reduced groundwater levels have eroded the natural groundwater outlet in the centre of the London Basin. This has resulted in the intrusion of saline river water from the tidal Thames and could lead to the release of sulphate-rich, acidic groundwater through pyrite oxidation. The impact of this requires additional research.
A group of experts were assembled in 1992 to manage the London Basin. The General Aquifer Research Development and Investigation Team (GARDIT) developed a strategy with five phases:
- Phase 1 - Thames Water to re-commission disused sources.
- Phase 2 - Thames Water to develop proven existing boreholes.
- Phase 3 - Private, commercial boreholes.
- Phase 4 - Thames Water to create new borehole sites in central area.
- Phase 5 - Thames Water to create new borehole sites in outer area.
The GARDIT strategy achieved its goal in 2000, however, subsequent data suggests levels will require continual artificial management.
[edit] Related articles on Designing Buildings
- Anisotropic.
- Aquifer.
- Aquitard.
- Clunch.
- Fertilizer groundwater pollution.
- Flint.
- Groundwater.
- Groundwater control in urban areas.
- Holloway.
- How adaptive planning is being used to future-proof water supplies in the South East.
- Isotropic.
- Thames barrier.
[edit] External resources
Featured articles and news
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.
Prostate Cancer Awareness Month
Why talking about prostate cancer matters in construction.
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.